A new localization era has begun under the Power Sector Indigenization Plan (PSIP).

0
76

Islamabad: The Engineering Development Board (EDB) is dedicated to establishing an important Power Sector Indigenization Plan (PSIP). This step is taken to achieve high target of manufacturing electric goods locally.

The PSIP shall cover the local development of Generation, Transmission and Distribution power equipment which includes Transformers, Switchgears, Cables & Conductors, Insulators, Towers, Heavy engine goods, Energy Meters, Capacitors and Overhead Transmission Line Fittings & Hard wares etc.

To execute this critical project, EDB has engaged consultancy services from the Lahore University of Management Sciences (LUMS) to develop a 10-year indigenization plan. The plan is based on extensive data collection from power generation, transmission, and distribution companies including CPPA-G, PPMC, Disco’s, NTDC, WAPDA and K-Electric Ltd., as well as local manufacturers, focusing on equipment requirements, testing infrastructure, and local manufacturing capacity.

Comprehensive efforts are underway, including stakeholder engagement through meetings and webinars, to ensure the successful collection of data. A digital dashboard has been developed to facilitate structured data acquisition, enabling effective demand and supply planning for the power sector.

This plan will serve as a cornerstone for the Government of Pakistan to formulate strategies for increased localization of electrical power equipment, reducing reliance on imports and boosting export potential, thereby strengthening Pakistan’s engineering and industrial sectors.

Subscribe our Newsletter to stay tuned.

LEAVE A REPLY

Please enter your comment!
Please enter your name here